Your three-project board.
Personal labels. Entered counts. Chosen statuses. A working note, without grades or a progression target.
Your working summary.
- Projects
- 0
- Recorded attempts
- 0
- Planning
- 0
- Trying
- 0
- Completed
- 0
What the board counts
Only labelled slots count as projects. The attempt total adds their entered counts. Status totals count the labels assigned to each status. Planning requires zero recorded attempts; trying and completed require at least one. An inconsistent slot clears the summary until corrected. These rules validate a note, not a climb.
The board has no account, grade conversion, gym connection or automatic saving. Entries stay in this page’s memory and clear on reload. Download creates a TXT file on your device. Read the project-note article for the limits beside the record.
Stone Monkey Apps · https://stonemonkeyapps.com/project-board/ · Independent editorial publication